Monday, July 26, 2021

Layout Update 26/07

 Work on retaining wall and tunnel portal at back of layout.










Started work on final part of plaster cloth landscaping. This section is being created to allow separation of the layout. Currently using electrical cable clips to hold in position, but considering adding an overhang using plyboard from underneath.






Couple of the tools I've been using recently for modelling:
  • mini bench disc sander, handy for sanding back plastic models to ensure a straight edge for gluing; and
  • dremel, with metal cutting disc, used for cutting track.



No comments:

Post a Comment

Layout Update 26/07

 Work on retaining wall and tunnel portal at back of layout. Started work on final part of plaster cloth landscaping. This section is being ...